Israel – Soda Stream Syrup Processing Plant

More Projects

Project Overview

  • Full installation of syrup processing plant
  • Two production lines
    • 2,500L preparation tank double jacket for mixing hot water with sugar
    • Two 2,000L single jacket tanks for flavoring tanks for filling in capsules
    • 1,000L preparation and flavoring for bulk filling and storage
    • Three tri-mixers one for each flavoring tank
    • PHE 5,000L/H for cooling the prepared syrup
    • PHE 6,000L/H for heating water for preparation tank
  • Sugar silo
  • Sugar pneumatic conveyor
  • Hot and cold water supply for all plants systems
    for production and packaging
  • Fully automated system with touch screen controlling unit
  • Working platform
  • CIP cleaning system

Scope of Project:

  • Planning
  • In house manufacturing of dairy components and equipment
  • Installation and Commissioning
  • Training (Technical, Technological)
  • After Sales Support